Zero-Potable Cooling Water for AI & Hyperscale Data Centres
Solve the AI thermal bottleneck without exhausting municipal water tables. Tigreen's patented Radical Bubble Purification (RBP) reclaims up to 90% of wastewater, slashes cooling tower chemical additives by 60%+, and delivers strict ASHRAE WUE (< 1.3 m³/MWh) compliance in a compact, containerized footprint.
The Global AI Heat vs. Water Paradox
High-density GPUs (H100/B200 clusters) require millions of litres of daily heat rejection. As municipal utilities impose severe moratoria, data centres face an existential water crisis.
Municipal Water Bans & Penalties
From Northern Virginia and Phoenix to Frankfurt and Bengaluru, cities are rejecting data centre permits or levying punitive utility surcharges on drinking water consumed by evaporative cooling towers.
Cooling Tower Scaling & Chemical Costs
Raw municipal or tanker water contains high dissolved solids and biological load, leading to rapid scaling, condenser tube fouling, and massive chemical expenditure to prevent corrosion and Legionella outbreaks.
2030 "Water Positive" Mandates
Hyperscale operators (Microsoft, Google, AWS, Meta) have legally binding commitments to replenish 100%+ of their water consumption by 2030. Unaudited groundwater pumping puts colocation leases at risk.
How Tigreen Transforms Cooling Tower Operations
Our patented Radical Bubble Purification (RBP) nozzle eliminates biological growth and micro-contaminants at the molecular level, delivering superior process water for HVAC loops.
60%+ Reduction in Cooling Water Chemical Additives
By removing organic precursors, TSS, and heavy metallic ions, Tigreen process water drastically reduces the need for expensive anti-scalants, biocides, and corrosion inhibitors in the primary condenser loop.
Higher Cycles of Concentration (CoC: 8x–10x)
Standard water limits cooling towers to 3x–4x cycles before blowdown must be dumped to prevent fouling. Tigreen water allows 8x to 10x cycles, cutting tower blowdown discharge volumes by up to 80%.
Zero Blowers: Whisper-Quiet < 60 dBA Operation
Unlike conventional aeration tanks that produce severe low-frequency hums and vibration, our hydraulic radical nozzles eliminate mechanical blowers, operating silently beside critical server rooms and generator bays.
Automated Modbus IoT & WUE Audit Telemetry
Integrated edge client with local SQLite store-and-forward buffering. Continuous telemetry tracks flow rates, conductivity, pH, and avoided municipal extraction, generating certified VWBA replenishment audit logs.
Data Centre Cooling Loop Integration
Interception of secondary facility effluent, greywater from campus, and cooling tower blowdown.
Microbubbles (<10 µm) generate •OH hydroxyl radicals, oxidising organic contaminants, oils, and surfactant complexes with zero blower energy.
Concentrated solids and surfactants float to the surface for automatic skimming. Less than 10% the sludge volume of conventional plants.
Ultra-pure, low-TDS water fed directly to HVAC chillers and cooling towers, delivering WUE < 1.3 m³/MWh.
Standard Skids & Custom-Built Plants
Choose from 4 pre-engineered packaged units (20 to 500 KLD) or request a custom-fabricated system up to 1,000+ KLD built to fit your site dimensions and effluent chemistry.
Handles 60,000 litres daily inside 18 m², saving up to ₹25 Lakhs annually in water tanker bills.
Tigreen TG-60 vs. Conventional ETP/STP
Tigreen Standardized SKUs — Engineering Quick Reference
All models are skid-mounted, pre-wired, pre-plumbed, and zero-civil ready.
| Model | Daily Volume | Flow Rate | Footprint | Connected Power | Lead Time | Target Applications |
|---|---|---|---|---|---|---|
| TG-20 | 20 KLD5,280 GPD | 1,000 LPH | 130 sq ft(12 m²) | 2 kW | 30–45 days | Boutique Apartments (15–40 Flats), Clinics, Hotels, Small Laundries |
| TG-60 | 60 KLD15,850 GPD | 3,000 LPH | 190 sq ft(18 m²) | 4.5 kW | 35–45 days | 100-Flat Apartments, 150-Bed Hospitals, Food Processing, Commercial Malls |
| TG-120 | 120 KLD31,700 GPD | 6,000 LPH | 235 sq ft(22 m²) | 6.5 kW | 45–60 days | Tier-2/3 Data Centres, Textile & Dyeing Units, IT Tech Parks, Industrial Campuses |
| TG-500 / Custom | 500 KLD132,000 GPD | 25,000 LPH | 540 sq ft(50 m²) | 18 kW | 60–90 days | Hyperscale AI Data Centres, Industrial Parks, Mega Townships & Custom Retrofits |
| Custom Built | 10 – 1,000+ KLDAny flow rate | 500 – 50,000+ LPH | Built to basement / yard space | Sized to load | Custom quote | Existing MBBR tank retrofits, odd-shaped basements, high-COD chemical & pharma streams |
Cooling Water Source Comparison Matrix
How Tigreen containerized process water compares against traditional water supply methods for data centres and high-density industrial facilities.
| Operational Criteria | Municipal Potable Mains | Private Tankers / Deep Wells | Conventional Biological STP | Tigreen RBP Process Water |
|---|---|---|---|---|
| Supply Reliability & Uptime | Unreliable (Subject to drought cuts) | Highly Volatile (Traffic & cartel risks) | Fluctuating (Frequent biological shock) | 99.9% Reliable (Continuous on-site loop) |
| Cooling Tower Chemical Additives | Baseline High | Extremely High (Hardness scaling) | High (Bio-fouling & odor risk) | 60%+ Reduction (Low TDS & zero bio-load) |
| Physical Footprint (500 KLD) | N/A (External piping) | Tanker unloading yards needed | 2,500 – 3,500 sq ft (Concrete tanks) | 300 sq ft (Single 40ft ISO Container) |
| Civil Construction Time | 3–6 months for utility lines | None | 6–12 months heavy civil works | Zero Civil Work (Delivered in 45–90 days) |
| Energy Consumption | Pumping only | Fuel intensive (Fleet transit) | High (Continuous 24/7 blowers) | 40–50% Lower (Hydraulic microbubbles) |
| Acoustic Noise / Vibration | Low | Truck noise | High (Heavy compressor drone) | < 60 dBA (Whisper Quiet, No Blowers) |
| Corporate ESG & 2030 Water Positive | Negative (Depletes municipal reserves) | Severely Negative (Groundwater depletion) | Neutral (Often not certified for cooling) | 100% Water Positive (Audited VWBA Credits) |
| Commercial Model | Variable tariffs + peak surcharges | Fluctuating spot prices | Heavy upfront CapEx + costly O&M | Zero-CapEx WaaS (Pay per m³ / kL produced) |
Zero-CapEx Water as a Service (WaaS)
Data centre operators shouldn't have to become wastewater treatment specialists. Under our BOOT (Build-Own-Operate-Transfer) model, Tigreen funds, installs, and runs the entire recycling infrastructure.
Zero Capital Expenditure
Tigreen manufactures and installs the containerized RBP unit at your facility with zero upfront capital outlay. All engineering, piping integration, and commissioning costs are absorbed by us.
Guaranteed Water Quality SLA
You pay a predictable, metered tariff strictly for the cubic meters of cooling-grade water delivered. Continuous IoT telemetry provides real-time verification of TDS, pH, and flow rate compliance.
100% Tigreen Managed O&M
Our certified field engineers handle all periodic maintenance, sensor calibration, and consumable upkeep. 24/7 remote cloud monitoring ensures zero unplanned chiller downtime.
Ready to eliminate potable water from your cooling infrastructure?
Our engineering team will conduct a comprehensive water audit of your facility and provide a tailored WaaS proposal within 5 business days.
Support & Info
Data Centres & Mission-Critical Cooling — FAQs
Data centre evaporative cooling systems require substantial volumes of makeup water. Tigreen's RBP technology reclaims on-site greywater and utility blowdown, converting it into ultra-pure, low-TDS cooling water. By bypassing municipal drinking water mains and preventing tower blowdown losses, facilities achieve strict ASHRAE WUE (< 1.3 m³/MWh) compliance without sacrificing thermal headroom.
Conventional makeup water contains high dissolved solids, silica, and bio-organic loads that cause scaling and Legionella risks in cooling loops, requiring heavy doses of anti-scalants, corrosion inhibitors, and biocides. Tigreen's radical microbubble oxidation strips organics, suspended solids, and heavy mineral complexes at the source, allowing cooling towers to run at 8x to 10x cycles of concentration (CoC) with minimal chemical conditioning.
Yes. A 120 KLD unit (TG206) occupies only 60 sq ft, while our 500 KLD unit (TG225) fits within a standard 40ft ISO container (300 sq ft). Unlike biological plants, Tigreen requires zero civil concrete basins, generates zero odor, and operates without air blowers/compressors, maintaining noise levels below 60 dBA adjacent to mission-critical infrastructure.
Under our Zero-CapEx WaaS model, Tigreen finances, manufactures, installs, and operates the containerized reclamation plant. The data centre pays a predictable, metered tariff per cubic meter ($/m³ or ₹/kL) of verified cooling-grade water produced. This completely removes capital expenditure hurdles and guarantees operational water uptime.
Every Tigreen containerized unit integrates with our industrial IoT edge gateway (Modbus TCP PLC poller). Real-time telemetry continuously logs flow rate, pH, conductivity, and dissolved solids with offline buffering. Data centres receive automated, audit-ready compliance certificates satisfying corporate 2030 Water-Positive pledges and ISO 14001 standards.